Description
Professional system for preparatory rehabilitation work in laterals/service connections from the main sewer
– 2 cutting robots – 1 system
– For all preparatory rehabilitation work of laterals/service connections
– Insertion of the system from the main sewer, only 1 manhole access required!
– Enables the removal of deposits, roots or other obstacles
– Cutting and opening the laterals after rehabilitation
– Inspection, high pressure flushing and short lining
– Insertion into laterals DN 100 – 150 / 4″ – 6″ possible
– The both cutting robot systems can be used individually without any restriction
– Individual connection to other carriages possible